Completed Projects

Bangladesh inland water transport authority

Dredging work by cutter suction dredger for maintaining navigability of Shakhernagor-Srinagar river route of ichamoti river/Tulshikhali-azaratpur-Jabra-Savar river route in the river dhaleshwari for the year 2013-14 (Daulatpur to Madurchar area)

Bangladesh inland water transport authority

Dredging work by cutter suction dredger including related works to developing navigability of Dhaka-sureswar-Angaria-Madaripur river route from Katapara to WAPDA ghat in the river Naria Khal (Lot-03)

Technologically advanced dredger equipped with GPS for accurate and efficient sediment removal.

Mongla Port Authority

Dredging by operating Mongla Port Authority’s own dredger.

Mongla Port authority, Bangladesh

Dredging at the Food Silo Area in the Harboure channel of Mongla Port

Technologically advanced dredger equipped with GPS for accurate and efficient sediment removal.

Bangladesh Water Development Board

Re-excavation of Betna river from km 15.000 to km 23.500 equal to 8500 meter in connection with Drainage Improvement of Polder No. 1,2, 6-8 & 6-8 (Extension) in Sathkhira District under Sathkhira O&M Division-2, BWBD, Sathkhira. (Package No: W-Sat-2/20, ID: 572728)

Schedule Your Consultation

Connect with a senior team member committed to understanding your needs and guiding you with expert advice every step of the way.